Discharge of condition for 25/2220/LBC: Condition 3 (Materials), Condition 4 (Decorative Tiles)
108 Exeter Road Exmouth EX8 1QH
30th June 2026
Conversion of a detached garage/stores to provide ancillary accommodation and storage for use in connection with the main dwelling. Alterations to roof and addition of cladding.
60A Douglas Avenue Exmouth Devon EX8 2HF
29th June 2026
Beech (row) : crown lift to 8m (back to the boundary line), no branch to be removed greater than 85mm in diameter.
1 Scott Drive Exmouth EX8 3LF
26th June 2026
Proposed loft conversion, Comprising dormers to the front and rear.
1 The Red Lodge 11 Elwyn Road Exmouth EX8 2EL
25th June 2026
Minor amendment to 25/2107/FUL (Single storey extension) to revise the roof form to a flat roof with roof lantern, reduce the footprint of the extension, make minor alterations to fenestration, and include a 20sqm area of hardstanding wrapping around the f
10 Mamhead View Exmouth EX8 1DS
23rd June 2026
Construction of second floor balcony and installation of velux window
Travershes Pound Lane Exmouth EX8 4NP
19th June 2026
Conversion of garage to ancillary accommodation with first floor extension above. New access point in boundary wall.
Travershes Pound Lane Exmouth EX8 4NP
19th June 2026
Conversion of garage to ancillary accommodation with first floor extension above. New access point in boundary wall.
32 Anson Road Exmouth EX8 4NY
18th June 2026
Single storey pitched roof rear/side extension
83 Exeter Road Exmouth EX8 1QD
16th June 2026
Reinstatement of former residential unit (C3) alongside existing commercial unit (Class E) including internal alterations to re-establish separate access and layout
16 Bapton Close Exmouth EX8 3LG
16th June 2026
Proposed front and rear dormers
27 Bicton Street Exmouth Devon EX8 2RU
16th June 2026
Replacement single glazed timer windows to front dormer.
27 Bicton Street Exmouth Devon EX8 2RU
16th June 2026
Replacement single glazed timer windows to front dormer
58 Valley Way Exmouth EX8 4RL
12th June 2026
Proposed single storey kitchen extension.
57 Ashleigh Road Exmouth EX8 2JZ
11th June 2026
Proposed garage conversion and addition of Render and Cladding to property.
Peninsula House 23 Foxholes Hill Exmouth EX8 2DF
10th June 2026
Addition of conservatory on front elevation, Alterations to fenestration & Retiling of roof.
10 Elwyn Road Exmouth EX8 2EL
8th June 2026
Demolition of existing dwelling and construction of 4no. detached self build dwellings with associated parking and landscaping
8 Flat 1 Church Street Exmouth Devon EX8 1PE
8th June 2026
Discharge of condition for 25/1409/FUL: Condition 3 (Acoustic Treatment), Condition 5 (Noise Mitigation), Condition 8 (Lighting)
200 Withycombe Village Road Exmouth EX8 3BD
4th June 2026
Oak - minor crown lift/remedial prune to remove several low-hanging branches (see annotated photograph) encroaching over neighbouring sheds and surrounding structures, together with the removal deadwood within the canopy.
20 Springfield Road Exmouth EX8 3JX
4th June 2026
Small amendment to previously approved open frame gazebo (24/1288/FUL), height increase of 250mm and change of roof slope from hip to gable. eco tiles to replace bitumen. Footprint staying the same as previously approved application.
Cedar Cottage Old Bystock Drive Exmouth Devon EX8 5EQ
4th June 2026
Proposed ground floor rear extension
31 New North Road Exmouth EX8 1RU
28th May 2026
Installation of commercial kitchen extraction flue
40 Foxholes Hill Exmouth EX8 2DQ
27th May 2026
Discharge of Condition for 26/0326/FUL: Condition 3 (cladding).
Aldborough Court 21 Douglas Avenue Exmouth Devon EX8 2HA
26th May 2026
T1, Holm Oak : crown reduce by 2m, approximately to previous pruning points, maximum diameter of cut (MDC) 50mm, southern aspect up to 75mm. Thin canopy on northern aspect by 20%, MDC 50mm. T2, Pine : remove deadwood. T3, Pine : remove deadwood.
Knappe Cross Nursing Home Brixington Lane Exmouth Devon EX8 5DL
21st May 2026
Discharge of condition for 22/1873/FUL: Condition 4 (CEMP), Condition 5 (Foul water drainage), Condition 6 (Surface water drainage), Condition 7 (Schedule of materials and finishes).